Details / How-To:
-
Navigate to Production → Automation → PdO Creation Wizard → Build Production Run
-
In the top portion, choose your starting point (wort or bright beer item), then input the quantity in turns (wort) or BBLs (bright beer) then a build direction. Next, put in the production date (wort) or due date (bright beer) and a time. When finished, click thebutton.
-
After you select a batch ID, verify & update the quantities (if needed), Production & Due Dates (if needed), and From / To Whs (required).Tip: Interval is set on the wort item in Item Master Data
-
Once you have set your date and times, click thebutton.Note: if you wish to change the date & time on all your PdOs you can set it in the top portion (Prod Date / Time as show below) and then press.
- To plan the next production run, click the
Comments